Bidding
PROJECT: Midd-West School District, New Stadium Fieldhouse
General Construction Contract
LOCATIONS: 8 Dock Hill Road, Middleburg, PA 17842
BIDS DUE: 05.06.24 Submit By 9:00AM - NEW DATE
Bid Documents Addendum

zipped folder ProjectManual
zipped folder Drawings
zipped folder Drawings_MEP

zipped folder Addendum01 NEW DATE
PDF file Addendum02NEW DATE - MAY 6

Schedule:
TBD

Summary: New Fieldhouse construction

Cast-In-Place Concrete; Unit Masonry Assemblies; Sheathing; Thermal Insulation; Sprayed Cellulosic Insulation; Insulated Overhead Service Doors; Metal Wall Panels; Metal Soffit Panels; EPDM Single Ply Membrane; Sheet Metal Flashing and Trim; Joint Sealants; Hollow Metal Doors and Frames; Overhead Coiling Counter Doors; Insulated Overhead Service Doors; Aluminum Windows; Door Hardware; Glazing; FRP Panel Ceilings & Suspension Systems; Resilient Wall Base; Resinous Flooring; Painting; Toilet Compartments; Operable Partitions; Signs

Review all Unit Prices, Alternates, and Allowances.
Prevailing Wages,
PA Public School background checks
PA Public Works E-Verify


East Coast Contracting Inc. makes no guarantees or warranties as to the accuracy or completeness of posted plans/specifications/addenda. Errors and/or omissions may occur. While care is taken to avoid this, East Coast Contracting, Inc. cannot be responsible for any loss or damage resulting from error or omission. Furthermore, East Coast Contracting, Inc. does not accept any liability for any technical issues or damage resulting from the use of this page and any documents linked or otherwise provided. Documents provided are strictly for use in preparing a quotation for products and services pertaining to this project. The documents' author retains all copyrights to those documents.