Active Projects
|
|
|
| PROJECT: |
DMVA Lickdale Facility
General Construction Contract
|
| LOCATION: |
40 Fisher Avenue, Jonestown, PA 17038
|
Life Cycle: |
PRE-CONSTRUCTION
|
| DESCRIPTION: |
work associated with the new HVAC equipment and removal/replacement of the existing acoustical ceiling grid/tile
|
| SCHEDULE: |
Date of Completion - 270 Calendar Days
|
|
| PROJECT: |
Donegal Primary School Alterations
General Construction Contract
|
| LOCATION: |
Donegal Primary School, 1055 Koser Road, Mount Joy, PA 17552
|
Life Cycle: |
PRE-CONSTRUCTION
|
| DESCRIPTION: |
Alterations include conversion of the District Office area to educational and office space serving the Primary School. Several existing classrooms will also be renovated, in order to add individual toilet rooms where needed, including new casework and finishes replacement. The project includes several alternate bids, including carpet replacement, central boiler plant replacement, and a new canopy at the entrance to the building on the east side, adjacent to the parent drop-off area
|
| SCHEDULE: |
Phase 1 – Administrative: Anticipated March 10-31, 2026
Phase 2 – Renovation District Admin Office: April 1 - June 16, 2026
Phase 3 – Summer Construction: June 17, 2026 – August 7, 2026
Phase 3A: June 17, 2026 – July 31, 2026
Phase 3B: August 1, 2026 – August 7, 2026
Completion 150 Calendar Days
|
|
| PROJECT: |
DMVA Blue Mountain Gym
General Construction Contract
|
| LOCATION: |
Fort Indiantown Gap, Area 4-117 Sports Arena, Annville, PA 17003
|
Life Cycle: |
PRE-CONSTRUCTION
|
| DESCRIPTION: |
Demolition, Cutting and Patching, Asbestos Abatement, Cast-In-Place Concrete, Concrete Unit Masonry, Cold-formed Metal Framing, Pipe and Tube Railings, Rough Carpentry, Miscellaneous Rough Carpentry, Thermal Insulation, Joint Sealants, Hollow Metal Doors and Frames, Door Hardware, Glazing, Non-Structural Metal Framing, Gypsum Board, Ceramic Tile, Wall Coverings, Interior Painting, Epoxy Coatings, Cementitious Coating, Interior Signage, Toilet Compartments, Toilet Room Accessories, Tub and Shower Enclosure, Fire Extinguisher Cabinets, Fire Extinguishers, Casework
|
| SCHEDULE: |
Final Completion 360 Days from the Notice to Proceed
|
|
| PROJECT: |
DGS Agriculture Bldg, Elevator Repair and Replacement
General Construction Contract
|
| LOCATION: |
301 North Cameron Street, Harrisburg, PA 17110
|
Life Cycle: |
CONSTRUCTION
|
| DESCRIPTION: |
Renovations to the 1963 Agriculture Building, focusing on safety, accessibility, and infrastructure upgrades. Key work includes modernizing the freight elevator and improving both the freight and passenger elevator machine rooms with new envelope treatments, fire-rated partitions, and mini-split cooling units. The penthouse exterior metal panels will receive a fluid-applied coating, and the emergency generator will be upgraded. At the lobby, the existing chair lift will be removed and replaced with an accessible ramp. The stormwater pump will also be replaced to improve drainage.
|
| SCHEDULE: |
391 Calendar Days from Date of Initial Job Conference
|
|
| PROJECT: |
Lower Dauphin School District, Mechanical Upgrades
General Construction Contract
|
| LOCATION: |
(3 schools) East Hanover ES, Nye ES and Lower Dauphin MS, Hummelstown, PA 17036
|
Life Cycle: |
CONSTRUCTION
|
| DESCRIPTION: |
HVAC upgrades to East Hanover Elementary School, Nye Elementary School and Lower Dauphin Middle School
|
| SCHEDULE: |
East Hanover ES - Final Completion September 2026
Nye ES - Final Completion September 2026
Middle School - Final Completion September 2027
|
|
| PROJECT: |
Northeastern High School Main Office Renovations
General Construction Contract
|
| LOCATION: |
300 High Street, Manchester, PA 17345
|
Life Cycle: |
CLOSEOUT
|
| DESCRIPTION: |
Renovations to the secure entrance and main office of the High School.
|
| SCHEDULE: |
Phased Project, Final Completion 05.01.2028
|
|
| PROJECT: |
Rebid Millersville University Sports Complex Improvements
General Construction Contract
|
| LOCATION: |
Millersville University, Lancaster, PA
|
Life Cycle: |
CONSTRUCTION
|
| DESCRIPTION: |
Renovating approx. 11,000 SF to provide improvements to the stadium locker rooms and complex. General Construction work will consist of selective demolition, sitework, concrete, masonry, drywall partitions, ceilings, ADA restroom finishes, and interior finishes.
|
| SCHEDULE: |
Substantial Completion by July 31, 2026
|
|
| PROJECT: |
DMVA Construct Building for Range Maintenance
General Construction Contract
|
| LOCATION: |
Fort Indiantown Gap, Annville, PA 17003
|
Life Cycle: |
CONSTRUCTION
|
| DESCRIPTION: |
The work under this Contract shall generally consist of, but not necessarily be limited to, providing all labor, material, devices, tools and equipment required for the complete new construction of an 8,000 SQFT Pre-engineered Metal Building (PEMB) for Range Maintenance located in area 24.
|
| SCHEDULE: |
365 calendar days from Government granted Notice to Proceed
|
|
| PROJECT: |
DMVA Building 0-48 Renovation
General Construction Contract
|
| LOCATION: |
Fort Indiantown Gap, Annville, PA 17003
|
Life Cycle: |
CONSTRUCTION
|
| DESCRIPTION: |
Renovation of USPFO facility located in area 00, building 0-48, of Fort Indiantown Gap, Annville, Lebanon county, PA
|
| SCHEDULE: |
120 Days after the Notice to Proceed
|
|
| PROJECT: |
Boiling Springs High School Window Replacement
General Construction Contract
|
| LOCATION: |
21 Academy Street, Boiling Springs, PA 17007
|
Life Cycle: |
CONSTRUCTION
|
| DESCRIPTION: |
Replacement of the original windows in the Boiling Springs High School
|
| SCHEDULE: |
Substantially Complete - July 28, 2025
Final Completion - August 4, 2025
|
|
| PROJECT: |
Finance Building - Elevator Renovation
General Construction Contract
|
| LOCATION: |
Finance Building, 613 North Street, Harrisburg,PA 17120
|
Life Cycle: |
CONSTRUCTION
|
| DESCRIPTION: |
Renovations to the 9 elevators in two construction Sequenses
Install fencing, floor, and wall protection. Selective Demolition. Concrete sump pits. Interior masonry walls. Flooring, sealed concrete . Hollow metal door frames, hollow metal, (mechanical penthouse). Door hardware, door operators, card access, keyed doors. Interior painting. Provide new gearless AC machines. Interior wood restoration for walls and ceilings (elevators 2-6). New Elevator Cab finishes ( # 8 and 9). New Freight Elevator ( # 7). Clean and refinish paint (#10). Turn over historic elevator items (finishes, floor indicators)
|
| SCHEDULE: |
Completion: 574 Calendar Days
|
|
| PROJECT: |
Pine Grove School District
High School Selective Interior Finish Replacement
General Construction Contract
|
| LOCATION: |
Pine Grove High School
101 School St, Pine Grove, PA 17963
|
Life Cycle: |
CONSTRUCTION
|
| DESCRIPTION: |
Proposed Project encompasses work in Multiple areas of the Pine Grove High School and shall include, Miscellaneous Drywall Preparation, Acoustical Grid & Ceiling Tile installation, Sealing of concrete floors, Painting, and Flooring Installation to include LVT, VCT, Carpet Squares, VCB, & Stair treads. All ceiling lights and devises shall be secured and reinstall by General Contractor. All contractors will be responsible for cleanup and debris removal daily. New work shall follow demo in sequence. Finishes that are to remain must be protected during construction.
|
| SCHEDULE: |
Notice to Proceed: June 2, 2025
Substantial Completion: August 8, 2025
|
|
| PROJECT: |
Millersville University
Renovations to Brooks Hall into Lombardo Hall College of Business
|
| LOCATION: |
Millersville University - Brooks Hall,
29-53 Brooks Drive, Millersville, PA 17551
|
Life Cycle: |
CONSTRUCTION
|
| DESCRIPTION: |
Multi-story addition and renovation to the existing Brooks Hall Business School within a 1930s (former) gymnasium building. Improvements include selective demolition of interior and exterior, window replacement, new mechanical system, fire protection, roofing replacement, and exterior envelope upgrades. Site improvements include improvements adjacent to the building.
|
| SCHEDULE: |
Completion - 02.26.25
|
|
| PROJECT: |
East Wing & Main Capitol - Upgrade/Replace Emergency
|
| LOCATION: |
East Wing of the Pennsylvania Capitol,
600 Commonwealth Avenue, Harrisburg, PA, 17110
|
Life Cycle: |
CONSTRUCTION
|
| DESCRIPTION: |
Remove Four (4) permanently built generator enclosures. Remove various structural and building elements to allow removal of equipment by this and other trades. Excavate, backfill and refinish 150' roadway crossing for new electrical ductbank. Refinish various building elements after removal of equipment. Seal various wall openings after removal of equipment. Repair concrete structural members and floors. Repair/Reinstall limestone wall sections. Provide One (1) Limestone exhaust flue structure Fourteen Feet Ten Inches (14'-10") high.
|
| SCHEDULE: |
Completion - 10.09.25
|
|
| PROJECT: |
Cocalico School District, Middle School Renovations
General Construction Contract
|
| LOCATION: |
650 South 6th Street, Denver, PA 17517
|
Life Cycle: |
CONSTRUCTION
|
| DESCRIPTION: |
The HVAC system is being fully upgraded, the building will be fully sprinkled, ceilings and lighting throughout the building are to be replaced and the entire building is to be painted. The auditorium area is to be completely renovated along with other selected educational areas. The crawlspace of the building will be provided with a vapor barrier and either stone fill or a concrete “floor” to prevent moisture drive through the exposed soils. New water service work for the fire protection is included on the site. The building will be occupied throughout the construction and an intensive phasing plan with shift and premium time work required is to be implemented to carry out the Work
|
| SCHEDULE: |
Substantial Completion: August 30, 2027
|
|
| PROJECT: |
East Wing Replacement of Escalators with Elevator,
HVAC Diffuser and Cafeteria Upgrades
General Construction Contract
|
|
| LOCATION: |
East Wing of the Pennsylvania Capitol,
600 Commonwealth Avenue, Harrisburg, PA, 17110
|
Life Cycle: |
CONSTRUCTION
|
| DESCRIPTION: |
Removal of the two existing escalators in the East Wing, and replacement with a monumental stair and a large group elevator. Upgrades to cafeteria ceiling, lighting, and HVAC. Modification of kitchen dishwasher steam exhaust.
|
| SCHEDULE: |
Completion: 10.09.25
|
|
| PROJECT: |
Boiling Springs High School Natatorium Improvements
General Construction Contract
|
| LOCATION: |
21 Academy Street, Boiling Springs, PA 17007
|
Life Cycle: |
COMPLETED
|
| DESCRIPTION: |
Repairs to the existing pool shell including the removal of the existing plaster finish and the installation of a finish system. The removal of existing tile lane markers, targets, diving boards and score boards and installation of new. The existing pool return lines and gutter system shall be refurbished. New finishes throughout the natatorium including new ceramic tile on the pool deck, new paint throughout, new acoustical treatments, new LED lighting and new finishes in the upper grandstand spectator area. All associated pool equipment shall be replaced and upgraded. The natatorium team rooms shall be partially reconfigured and completely renovated and upgraded to include ADAAG compliance, along with new finishes and lighting. An existing second floor mechanical room will be reconfigured to create a concessions room with storefront entrance. The existing office storefront will be replaced.
|
| SCHEDULE: |
Substantially Complete - 09.15.25
Final Completion - 09.29.25
|
|
| PROJECT: |
Manheim Borough, Northwest EMS Conversion to Borough Hall
General Construction Contract
|
| LOCATION: |
60 W. Colebrook St, Manheim, PA 17545
|
Life Cycle: |
COMPLETED
|
| DESCRIPTION: |
Alterations and renovations to the existing NW EMS Building and all associated site work
|
| SCHEDULE: |
Substantial Completion: September 7, 2025
Final Completion: November 7, 2025
|
|
| PROJECT: |
Elizabethtown Training Academy -
Renovate Boiler Plant and Domestic,Fire Protection (PHASE 2)
|
| LOCATION: |
1451 North Market Street, Elizabethtown, PA 17022
|
Life Cycle: |
COMPLETED
|
| SCHEDULE: |
Completion: 10.08.25
|
|
| PROJECT: |
(DGS)Loysville Youth Development Center
Renovations to Zimmerman-Bingaman (ZB) Cottage
|
|
| LOCATION: |
Loysville Youth Development Center
10 Opportunity Drive, Loysville, PA 17047
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
Mechanicsburg Middle School Aluminum Entry Replacement
General Construction Contract
|
| LOCATION: |
1750 S. Market Street, Mechanicsburg, PA 17055
|
Life Cycle: |
COMPLETED
|
| SCHEDULE: |
Substantially Complete 138 calendar days
|
|
| PROJECT: |
Midd-West School District, New Stadium Fieldhouse
General Construction Contract
|
|
| LOCATION: |
8 Dock Hill Road, Middleburg, PA 17842
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
The Pennsylvania State University
(REBID) HB Athletic Fields Bleachers, Press Box and Restroom Building
|
|
| LOCATION: |
Pennsylvania State University-Harrisburg Campus
777 W Harrisburg Pike, Middletown, PA 17057
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
DMVA Multiple Range SAROCA
|
| LOCATION: |
Ranges 7, 8Q & 8Z, 9Z, 11, Fort Indiantown Gap,
Annville, PA 17003
|
Life Cycle: |
COMPLETED
|
| SCHEDULE: |
Completion - 08.06.25
|
|
| PROJECT: |
Reamstown Elementary Renovations
General Construction Contract
|
|
| LOCATION: |
44 S Reamstown Rd., Reamstown, PA 17567
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
PSU-HB-Library-Window Repairs/Replacement
General Construction Contract
|
|
| LOCATION: |
Pennsylvania State University-Harrisburg Campus
777 W Harrisburg Pike, Middletown, PA 17057
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
DMVA Building 12-07 Renovation
General Construction Contract
|
|
| LOCATION: |
Fort Indiantown Gap, Area 12, Clement Ave., Annville, PA 17003
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
Elizabeth Township Addition-Renovation
General Construction Contract (Single Prime)
|
|
| LOCATION: |
423 Southview Drive, Lititz, PA 17543
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
Southampton Township Equipment Building
|
|
| LOCATION: |
200 Airport Road, Shippensburg, PA 17257
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
York County Central Booking Relocation
General Construction Contract
|
|
| LOCATION: |
3400 Concord Rd., York, PA 17402
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
Millersville University, Pucillo HVAC Renovation
General Construction Contract
|
|
| LOCATION: |
105 Pucillo Drive, Millersville, PA 17551
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
Hampden Township Aquatics Center Improvements
General Construction Contract
|
|
| LOCATION: |
5002 Hampden Park Dr, Mechanicsburg, PA 17050
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
DMVA Building 4-19 Renovations
General Construction Contract
|
|
| LOCATION: |
Fort Indiantown Gap, Annville, Lebanon County, PA 17003
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
HACC Indoor-Pool Decommissioning
General Construction Contract
|
|
| LOCATION: |
Harrisburg Area Community College,
J. Evans Physical Education Building,
One HACC Drive, Harrisburg, PA 17110
|
Life Cycle: |
COMPLETED
|
|
| PROJECT: |
Gettysburg Office Building Renovations
General Construction Contract
|
|
| LOCATION: |
424 E. East Middle Street , Gettysburg, PA 17325
|
Life Cycle: |
COMPLETED
|
|