PLANS AND SPECIFICATIONS:
|
A link to the bid documents can be found in the invitation to bid.
If you are not receiving our invitations to bid through email and would like to, please Sign Up via our website on the bidding page.
Review all Unit Prices, Alternates, and Allowances.
|
|
PROJECT: |
Manheim Borough, Northwest EMS Conversion to Borough Hall
General Construction Contract
|
LOCATION: |
60 W. Colebrook St, Manheim, PA 17545
|
BIDS DUE: |
04.01.25
Submit By 03.31.25 by 4:00PM
|
DESCRIPTION: |
Alterations and renovations to the existing NW EMS Building and all associated site work
|
SCHEDULE: |
Substantial Completion: September 7, 2025
Final Completion: November 7, 2025
|
OTHER: |
Prevailing Wages, PA Public Works Employment Verify
|
|
PROJECT: |
DMVA New Auditorium
General Construction Contract
|
LOCATION: |
Fort Indiantown Gap, Annville, PA 17003
|
BIDS DUE: |
04.07.25
Submit By 04.06.25 by 4:00PM
|
DESCRIPTION: |
New 23,307 SF Auditorium with a mechanical mezzanine and associated site development will be constructed on a previously developed site for DMVA.
|
SCHEDULE: |
574 Calendar Days from Date of Initial Job Conference
|
OTHER: |
Prevailing Wages, PA Public Works Employment Verify
Security Gate Restrictions Implemented in Fall of 2023.
Proposals shall be good for not less than 60 days from Bid Opening
|
|
PROJECT: |
Boiling Springs High School Natatorium Improvements
General Construction Contract
|
LOCATION: |
21 Academy Street, Boiling Springs, PA 17007
|
BIDS DUE: |
04.14.25
Submit By 04.14.25 by 8:00 AM
|
DESCRIPTION: |
Repairs to the existing pool shell including the removal of the existing plaster finish and the installation of a finish system. The removal of existing tile lane markers, targets, diving boards and score boards and installation of new. The existing pool return lines and gutter system shall be refurbished. New finishes throughout the natatorium including new ceramic tile on the pool deck, new paint throughout, new acoustical treatments, new LED lighting and new finishes in the upper grandstand spectator area. All associated pool equipment shall be replaced and upgraded. The natatorium team rooms shall be partially reconfigured and completely renovated and upgraded to include ADAAG compliance, along with new finishes and lighting. An existing second floor mechanical room will be reconfigured to create a concessions room with storefront entrance. The existing office storefront will be replaced.
|
SCHEDULE: |
Substantially Complete - 09.02.25
Final Completion - 09.15.25
|
OTHER: |
Prevailing Wages, PA Public School background checks,
PA Public Works Employment Verify
|
|
PROJECT: |
Finance Building - Elevator Renovation
General Construction Contract
|
LOCATION: |
Finance Building, 613 North Street, Harrisburg,PA 17120
|
BIDS DUE: |
04.24.25
Submit By 04.23.25 by 4:00PM
|
DESCRIPTION: |
Renovations to the 9 elevators in two construction Sequenses
Install fencing, floor, and wall protection. Selective Demolition. Concrete sump pits. Interior masonry walls. Flooring, sealed concrete . Hollow metal door frames, hollow metal, (mechanical penthouse). Door hardware, door operators, card access, keyed doors. Interior painting. Provide new gearless AC machines. Interior wood restoration for walls and ceilings (elevators 2-6). New Elevator Cab finishes ( # 8 and 9). New Freight Elevator ( # 7). Clean and refinish paint (#10). Turn over historic elevator items (finishes, floor indicators)
|
SCHEDULE: |
Completion: 574 Calendar Days
|
OTHER: |
Prevailing Wages, PA ACT34 background checks,
PA Public Works Employment Verify
|
|
Post Bid
|
|
PROJECT: |
REBID - Hampden Township Park Restroom Facility Renovations
General Construction Contract
|
LOCATION: |
5002 Hampden Park Drive, Mechanicsburg, PA 17050
|
RESULTS: |
PENDING
|
DESCRIPTION: |
REBID - Restroom Facility Renovations
|
SCHEDULE: |
Substantially Complete 180 Days
|
OTHER: |
Prevailing Wages, PA Public Works Employment Verify
|
|
PROJECT: |
Pine Grove School District
High School Selective Interior Finish Replacement
General Construction Contract
|
LOCATION: |
Pine Grove High School
101 School St, Pine Grove, PA 17963
|
RESULTS: |
AWARDED
|
DESCRIPTION: |
Reinstallation of existing lights & electrical devices. Installation of Metal stud & Drywall, Acoustical ceilings, LVT, Carpet squares, VCB, Stair treads & transitions. Installation of new Whiteboards & wall painting
|
SCHEDULE: |
Notice to Proceed: June 2, 2025
Substantial Completion: August 8, 2025
|
OTHER: |
Prevailing Wages, PA Public School background checks,
PA Public Works Employment Verify
|
|
PROJECT: |
Millersville University Sports Complex Renov.
General Construction Contract
|
LOCATION: |
35 Pucillo Drive, Millersville, PA 17551
|
RESULTS: |
Owner Rejected All Proposals. Project will Rebid
|
|